Statistics for 2023

The number of volunteers I was able to host was greatly reduced throughout 2023 as I was unable to continue offering free accommodation. I withdrew using Rigas House as they were making more and more demands in return for their offer and other options simply dried up. So volunteers had to pay, albeit a small amount or I took advantage of other opportunities. Due to a bad experience, I stopped offering a room at my house but continued to prepare an evening meal on the days we worked plus I provided the tools and transport and worked along side our wonderful helpers. One good thing was that the municipality gave me the use of a place to store all my tools. This has made life so much easier.

I really hope the famous trails project happens this year. It’s been over 4 years since it’s inception when the study was carried out and accepted. The start date keeps being pushed back without explanation. In the meantime, two portions of routes contained in the study have been asphalted over and two have been fenced; both by foreign land owners.

VOLUNTEERS AND TRAILS CLEARED – 2023

6-11 January Baiba (Latvia) Robert (Canada) Polymistria Trail down to Kambos section I

13, 17,18 January section II to Petrovrissi (rain 12th, 14th, 15th, 16th)

19,22,23,24,25,28,29 = 120 hours Kalogeros through to coast

31 January Ypermachou

1 February Signing at Palouki

2,3 February B & R Pera Karia – to Analipsis

22,23,24 February Me, Peter & Nikos Loutraki waterfall

10,11,13,14,20,21,23,24,26 March Alex Wright (28th March) Pera Karia continuation

15 March Alex (UK) Pefkias

19,20 April Suzie (Australia) +1 day Opel & Anna Refuse tip down to Glysteri (Monks)

23,24,25 April+1,2 April Suzie (17 April-21 March) Potami calderimi

4 May Suzie Gateway maintenance

6,11,17,18,20 May Suzie + Christian + 2 Glysteri (Monks Trail)

8,11,12 May Suzie & Christian (Austria) Chickpea trail

14,15 May Christian Ag Reginos Pirgos Retsina trail (clearing power company damage)

10 October Madeleine & Liam (USA) Adventure Trail/Deer Park/mend gates

11 October M & L Improve Signs at Sendoukia

12 October M & L Moutero

16, 17,19 October M & L Monks Tzukala, Glysteri

22 November Chris & JP (Canada) Michalakis

2 December Amy (Canada) Retsina trail, Pirgos

13,14,15,18,19 Tim, Remco, Miranda (Holland) Retsina trail, Pirgos

23,24 Remco & Miranda Myli trail

TOTALS: 7 WORKAWAY VOLUNTEERS PLUS 6 OTHER HELPERS + 6 DAY HELPERS = 19

NATIONALITIES: Latvia 1, Canada 1, Australia 1, Austria 1, USA 2, UK 1 = 7 + Holland 3, Canada 3 + Peter (Holland), Nikos (Greek), 4 ladies = 19

The T Trails

posted in: Uncategorized | 1

Some time prior to 2010, the local council obtained funding for:

  • to pave and sign seven trail heads
  • to install umpteen covered picnic areas with seating, a table and a small waste bin
  • a paved ‘platia’ in Djelili
  • the restoration of the Old Klima council office complete with air conditioning unit
  • a roof in the style of the picnic area over the Klima spring

The routes (all linear) were partially covered (some more than others) with rocks and in some places a small entrance wall erected. The trails’ surface were rendered uneven, uncomfortable and wobbly to walk on – most are downright dangerous in fact, of bad workmanship and a total waste of money as they weren’t needed in the first place.

Some walls and kiosks have fallen down and just left in a dilapidated condition, the bins are useless and in such remote areas there would never be a collection possible.

The council office doors have never opened.

The signs are not to EU standards.

The overview maps at the port were situated facing the car park and being under a roof, the area became a motorbike parking spot until recently when it became a seating area. The maps anyway became quickly faded and are now rendered useless.

The latest Terrain map doesn’t give them a mention and the poles will be removed as part of the famous Hiking Project. Pity the same can’t be said about the stones.

Try as I might, I couldn’t find out who sanctioned this white elephant of a project nor what criteria was used for choosing the routes, why the beach like stones were used when there was already a perfectly comfortable trail existing nor why a council building would be restored in, for the most part of the year, an uninhabited village.